Travel Planner Kit — 6 modules, one file

Travel Planner Kit —
Trip Budget, Packing
& Expense Tracker

Plan your entire trip in one single file — no app, no account, no subscription.

$8.95

Trip planning is exciting.
Managing it across five apps is not.

Budget, packing, accommodation, expenses, checklists — scattered across notes, spreadsheets, and apps that don't talk to each other.

📱

Your trip planning is spread across five different apps and a notes file

Budget in a spreadsheet, packing in a notes app, flights in one place and hotel confirmations in email. When something changes, you update four places — and something always slips through.

🧳

You forget half the packing list until you're already at the airport

A mental packing list is not a packing list. You remember the charger only after boarding and the adapter only after landing. A reusable checklist for every trip is worth more than you think.

💸

Tracking expenses across currencies during the trip is a mess afterward

You return with a vague idea of what you spent, receipts in your pockets, and no idea if you stayed within budget. Logging expenses as you go takes thirty seconds and saves hours of confusion.


What the tool looks like

A complete trip planner — budget, expenses, packing and accommodation, all in one private file.


6 modules covering every part
of your trip, from planning to return

Everything you need to plan, pack, track, and review your trip — in one file, without a single account or subscription.

💰

Budget

Set a total trip budget and track the remaining balance in real time. See at a glance whether you're on track or overspending — before it's too late to adjust.

🧾

Expenses

Log every expense by category — accommodation, food, transport, activities, shopping. Export the full breakdown as CSV at any time to review or share.

🧳

Packing List

Build your packing list by category — clothing, documents, toiletries, electronics. Check items off as you pack and reuse the list for future trips.

🏨

Accommodation

Store all your bookings in one place — hotel name, address, check-in/out dates, confirmation number, and notes. No more digging through email for reservation details.

✈️

Trip Info

A central place for all essential trip details — destination, dates, flight numbers, emergency contacts, and travel insurance info. Everything you need in a panic, in one place.

✅

Checklist

A to-do checklist for everything before, during, and after the trip — from booking to cancelling subscriptions. Nothing falls through the cracks.


Built to actually work — without the trade-offs

No app to install, no account to create, no subscription to maintain. Just a file that works from the moment you open it.

💱

12 currencies included

Track expenses in your local or destination currency — 12 options including USD, EUR, GBP, MXN, COP, BRL, and more. Switch anytime without losing data.

💾

Data saved automatically in your browser

Everything you enter is saved automatically. Close the tab, reopen the file later — your trip data is still there exactly as you left it.

📤

Export to CSV and PDF

Export your full expense log as CSV for spreadsheet analysis, or print any section as PDF to share with travel companions or archive.

✈️

Works 100% offline

No internet required — ever. Open the file on the plane, in the hotel, or anywhere with no signal. Everything runs in your browser.

🌐

Bilingual interface (EN / ES)

Switch between English and Spanish at any time. Every label and module fully translated — useful for solo and group trips alike.

📂

Zero installation — one HTML file

Download once, open in any browser. No setup, no extensions, no accounts. Works on any device — desktop, tablet, or phone.


Questions before buying

Yes. Reset the data and start fresh for each trip, or keep a separate copy per trip. Since it's just a file, you can duplicate it as many times as you need — no limits, no extra cost.
Completely. The file runs entirely in your browser with no internet required at any point. Open it on a plane, in a hotel, or anywhere with no signal — it works exactly the same.
One-time purchase. You pay $8.95 once and the file is yours forever — no recurring charges, no license keys, no account needed.
Data is stored in your browser's localStorage. Clearing browser data will reset it. Export to CSV or print to PDF regularly to keep a permanent record before clearing or switching devices.

6 modules. One file.
One payment — yours forever.

No app. No subscription. Plan your entire trip in one place you actually control — starting today.

Buy on Gumroad → Buy on Creem →

Questions first? Get in touch before buying.